Blog

Metro and Underground Maps Designs Around the World

2 min read
Metro and Underground Maps Designs Around the World

In this post, we have collected some interesting metro map designs around the globe. These maps show the infrastructure of the city; each city is different from another because of the look, feel, regional culture, typography and many other things. These maps would be helpful for you in exploring these differences and would also come handy when you want to find out any place in the city. As designer, you can also learn a bit or two about wayfinding graphics when analyzing these designs. So, here’s the inspiring compilation of metro maps from around the world.


Europe

Paris, France

Metro and Underground Maps Designs Around the World Image-1

London Map

Metro and Underground Maps Designs Around the World Image-2

Berlin, Germany

Metro and Underground Maps Designs Around the World Image-3

Naples, Italy

Metro and Underground Maps Designs Around the World Image-4

Oslo, Norway

Metro and Underground Maps Designs Around the World Image-5

Lille – France

Metro and Underground Maps Designs Around the World Image-6

Frankfurt Subway Map, Germany

Metro and Underground Maps Designs Around the World Image-7

Oslo, Norway

Metro and Underground Maps Designs Around the World Image-8

Prague, Czech Republic

Metro and Underground Maps Designs Around the World Image-9

Barcelona, Spain

Metro and Underground Maps Designs Around the World Image-10

Amsterdam, Netherlands

Metro and Underground Maps Designs Around the World Image-11

Athens, Greece

Metro and Underground Maps Designs Around the World Image-12

Munich, Germany

Metro and Underground Maps Designs Around the World Image-13

Vienna, Austria

Metro and Underground Maps Designs Around the World Image-14

Lyon, France

Metro and Underground Maps Designs Around the World Image-15

Bucharest, Romania

Metro and Underground Maps Designs Around the World Image-16

Buenos Aires, Argentina

Metro and Underground Maps Designs Around the World Image-17

Lausanne, Switzerland

Metro and Underground Maps Designs Around the World Image-18

Brussels, Belgium

Metro and Underground Maps Designs Around the World Image-19

America

Boston, USA

Metro and Underground Maps Designs Around the World Image-20

NYC Subway Map

Metro and Underground Maps Designs Around the World Image-21

Chicago’s Metro

Metro and Underground Maps Designs Around the World Image-22

WASHINGTON D.C., USA

Metro and Underground Maps Designs Around the World Image-23

SAN FRANCISCO

Metro and Underground Maps Designs Around the World Image-24

Atlanta, United States

Metro and Underground Maps Designs Around the World Image-25

Baltimore

Metro and Underground Maps Designs Around the World Image-26

Osaka Railway System

Metro and Underground Maps Designs Around the World Image-27

Brasilia, Brazil

Metro and Underground Maps Designs Around the World Image-28

BARCELONA

Metro and Underground Maps Designs Around the World Image-29

Houston Metro Map

Metro and Underground Maps Designs Around the World Image-30

New York, United States

Metro and Underground Maps Designs Around the World Image-31

Montreal, Canada

Metro and Underground Maps Designs Around the World Image-32

Asia

Beijing, China

Metro and Underground Maps Designs Around the World Image-33

Hong Kong

Metro and Underground Maps Designs Around the World Image-34

Moscow, Russia

Metro and Underground Maps Designs Around the World Image-35

Pyongyong, North Korea

Metro and Underground Maps Designs Around the World Image-36

Tokyo City Map, Japan

Metro and Underground Maps Designs Around the World Image-37

Singapore Metro

Metro and Underground Maps Designs Around the World Image-38

Sapporo

Metro and Underground Maps Designs Around the World Image-39

DUBAI, UAE

Metro and Underground Maps Designs Around the World Image-40

Kyoto, Japan

Metro and Underground Maps Designs Around the World Image-41

Bangkok, Thailand

Metro and Underground Maps Designs Around the World Image-42

Mumbai, India

Metro and Underground Maps Designs Around the World Image-43

SHANGHAI, China

Metro and Underground Maps Designs Around the World Image-44

Deagu, South Korea

Metro and Underground Maps Designs Around the World Image-45

Kiev, Ukraine

Metro and Underground Maps Designs Around the World Image-46

Photo by Bo Kim on Unsplash

Send Comment:

Jotform Avatar
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Comments: